What a signature bonus is
A signature bonus is a one-time fixed payment for the acquisition of the subsoil use right within the contract territory (subsoil plot), as well as for its expansion (Art. 759 of the Tax Code). It is not a regular tax: return 510.00 is filed only for the quarter in which the payer's bonus payment deadline fell.
How the amount is determined
- Tender, auction, direct negotiations. The code sets the starting amount (Art. 761 of the Tax Code), expressed in MCI as of the date of publication of the tender conditions or of signing the protocol. For example, for exploration contracts in a territory without approved reserves: hydrocarbons — 2,800 MCI, solid minerals — 280 MCI, common minerals, groundwater and therapeutic mud — 40 MCI. For contracts for the production (combined exploration and production) of hydrocarbons without approved reserves — 3,000 MCI, and with approved reserves — a percentage of the value of the reserves (0.04% for commercial categories and 0.01% for preliminarily estimated ones), but not less than 10,000 MCI. For contracts for the processing of technogenic mineral formations — not less than 300 MCI, for the use of subsoil space — 400 MCI. The tender commission may increase the starting amount; the final amount (not lower than the starting amount) is fixed by the decision of the commission or the competent authority and included in the contract.
- Licences issued other than on the basis of an auction (Art. 762 of the Tax Code) — fixed rates in MCI as of the date of payment: exploration licence — 100 MCI, production licence — 200 MCI, licence for geological study of the subsoil — 50 MCI, licence for use of subsoil space — 400 MCI, prospecting licence — 9, 12 or 15 MCI depending on the area of the plot (up to 17,000, up to 33,000, up to 50,000 sq. m). Licences for exploration or production of solid minerals issued on the basis of an auction are calculated under the rules of Art. 761.
- Expansion of the territory: if there are approved reserves in the new area — as for new reserves; without approved reserves — the initial bonus is multiplied by the expansion coefficient (the ratio of the added area to the initial area, to four decimal places); an increasing coefficient of 3 applies to the part of the coefficient exceeding 0.1.
How to file
- Determine the date from which the payment deadline runs (declaration as winner, signing of the protocol, registration of a contract amendment, issue of a licence or permit) and the quarter in which the payment deadline falls.
- Pay the bonus at the place of location within the established time limit (20 or 10 business days).
- Complete the general part: IIN/BIN, quarter, currency code, type of return, name of the contract (licence) and field, mineral code, date and number of the contract/permit or licence, date of being declared the winner or of signing the protocol of direct negotiations, and in the case of expansion — date and number of the supplement to the contract; mark the type of payment: “signature bonus” or “signature bonus upon expansion of the contract territory”.
- In line 510.00.001, indicate the amount of the bonus payable, calculated under Art. 761 and 762 of the Tax Code.
- Submit the return electronically via the taxpayer's online account (Cabinet) (a web application of the SRC), the tax mobile application or accounting software connected to the tax authority's information system (IS SONO), signed with the EDS of the legal entity. A paper version is allowed (in two copies), but in practice subsoil users submit their reporting electronically.
- Wait for the status “Document accepted” following format and logical control: only after that is the reporting deemed submitted (para. 5 of Art. 115 of the Tax Code). The status “Document not accepted” means that there is no return.
Appendices
There are no appendices — the form consists of one sheet with general information, the amount payable and the taxpayer's responsibility section.
Nuances
- The form may also be filed by an individual (for example, under a prospecting licence) — the IIN is indicated in the field.
- For contracts where the time limit starts running from an event, the time limit is counted from the following day (para. 1 of Art. 64 of the Tax Code); business days, not calendar days, are counted.
- The value of reserves for calculating the bonus is determined on the basis of exchange quotations on the day preceding the publication of the tender conditions or the signing of the protocol; if there are no quotations, the minimum amounts apply.
- If the last day of the deadline falls on a day off or a public holiday, the deadline is moved to the nearest business day (para. 2 of Art. 64 of the Tax Code).
- From 2026, there is no extension of the filing deadline; an accepted return cannot be withdrawn (para. 9 of Art. 115 of the Tax Code) — errors are corrected only by an additional return or a return upon notification (Art. 116 of the Tax Code). An additional payment under an additional return filed before an audit is made without liability being imposed, but with late payment penalties.
- If the return is not filed on time, the tax authority's information system itself generates “automatic” reporting with zero figures (para. 6 of Art. 115 of the Tax Code); if there is an object of taxation, an additional return must be filed to it (para. 7 of Art. 115).
- An additional return cannot be filed for a period that is under audit or appeal (para. 3 of Art. 116 of the Tax Code).
Common mistakes
- Counting the payment deadline in calendar days instead of business days.
- Filing the return for the quarter in which the contract was concluded rather than for the quarter in which the payment deadline fell.
- Applying the MCI as of the wrong date: for a tender — as of the date of publication of the conditions or signing of the protocol; for licences under Art. 762 — as of the date of payment.
Frequently asked questions
We obtained a licence for exploration of solid minerals without an auction. How much do we pay?
100 MCI at the MCI as of the date of payment, no later than 10 business days from the date of issue of the licence (Art. 762, para. 2 of Art. 764 of the Tax Code), and file 510.00 for the quarter of payment by the 15th day of the second month after it.
Is a return required if there were no new contracts or expansions in the quarter?
No. Only the quarter in which the bonus payment deadline fell is deemed the tax period.
Is the bonus paid upon transition from exploration to production after commercial discovery?
No, if the production contract is concluded under an exclusive right after commercial discovery in the same territory and the bonus has already been paid upon conclusion of the exploration contract (Art. 760 of the Tax Code).