Fee rates (Art. 659 of the Tax Code)
| Situation | Rate per 1 kWh |
|---|---|
| Electricity purchased from a power supply organisation (general case) | KZT 2 |
| Electricity from own power plants using renewable energy sources in the Republic of Kazakhstan or from generating units not connected to the unified power system | KZT 1 |
| No digital mining licence, no metering devices or they are faulty | KZT 25 |
If there are no metering devices or they are faulty, the volume of consumption is calculated as if the equipment had operated around the clock at maximum capacity (para. 3 of Art. 659 of the Tax Code).
How to file
- Take the readings of the control metering devices for each month of the quarter separately for electricity purchased from a power supply organisation and for energy from own generation from renewable sources or isolated units.
- Calculate the fee: the actual volume in kWh multiplied by the corresponding rate.
- Complete in the taxpayer's online account (Cabinet) of the ISNA: 880.01 — for energy from a power supply organisation; 880.02 — for energy from renewable sources or isolated units. The totals are transferred to the main Form 880.00, which also shows the number and date of the digital mining licence.
- Submit the return by the 15th day of the second month after the quarter to the tax authority at the place of location.
- Pay the fee by the 25th day of the same month.
Filing methods:
- Electronically — via the new taxpayer's online account (Cabinet) of the ISNA (a web application of the SRC), the tax mobile application or accounting software connected to the SRC system. The return is signed with the EDS of the head (for an individual entrepreneur — of the entrepreneur himself). According to the SRC, in 2026 the forms are being gradually disabled in the IS SONO and the old Cabinet — you need to work in the ISNA.
- On paper — in person at the state revenue office (two copies, one is returned with a stamp) or by registered mail with acknowledgement of receipt.
Deadlines in 2026
| Quarter | Return | Payment |
|---|---|---|
| Q1 | by 15 May | by 25 May |
| Q2 | by 15 August | by 25 August |
| Q3 | by 15 November | by 25 November |
| Q4 | by 15 February 2027 | by 25 February 2027 |
What is reported in the form
The main form shows general information about the payer (residency, country code and tax registration number for a non-resident, number and date of the licence) and the total amount of the fee: for purchased energy, for energy from own generation, and the total amount payable. The appendices show monthly consumption volumes, rates and amounts.
Nuances
- The fee does not depend on the digital assets mined or their value — only the electricity consumed is subject to the fee.
- The code expressly names as a payer a data centre that provides computing infrastructure to miners. How the obligation is divided between the data centre and the miner for the same electricity is not detailed in the Tax Code — this should be set out in the contract and clarified with the tax authority.
- A faulty meter creates a double risk: the KZT 25 rate and an estimated volume based on maximum capacity for the entire period.
- The mining fee does not replace taxes on income from mining (CIT or PIT) and VAT, if the payer is registered for VAT.
- If the last day of the deadline falls on a non-working day, the deadline is moved to the nearest following business day (para. 2 of Art. 64 of the Tax Code). Electronically, the obligation can be fulfilled until 24:00 on the last day.
- A report is deemed accepted only after format and logical control with the status “Document accepted” (para. 5 of Art. 115 of the Tax Code).
- From 2026, if the regular reporting is not submitted on time, the system itself generates a report with zero figures (para. 6 of Art. 115 of the Tax Code). If there was an object of taxation, an additional report must be submitted to the automatically generated one (para. 7 of Art. 115 of the Tax Code).
- Tax reporting cannot be withdrawn (except for application 328.00) — errors are corrected by an additional report showing the difference in amounts (para. 9 of Art. 115, Art. 116 of the Tax Code). Amounts additionally assessed by the taxpayer itself in an additional report are paid without liability being imposed (para. 1 of Art. 116 of the Tax Code).
- An additional report cannot be submitted for a period that is under audit or for a period for which the audit results are being appealed (para. 3 of Art. 116 of the Tax Code).
- The new code contains no rules on extending the deadline for submitting tax reporting.
Frequently asked questions
What is the mining fee rate in 2026?
KZT 2 per kWh for energy from the grid, KZT 1 for energy from own renewable energy plants or isolated units, KZT 25 without a licence or without functioning metering devices.
We lease equipment and electrical capacity to miners. Are we payers?
Yes. Persons that provide miners with integrated computing infrastructure services are also payers.
How often is 880.00 filed?
Quarterly: the return — by the 15th day of the second month after the quarter, payment — by the 25th day of the same month.
What happens if the meter broke down in the middle of the quarter?
For the period of the malfunction, the volume is calculated on the basis of round-the-clock operation at maximum capacity, and the rate is KZT 25 per kWh.